Direct Pipe®
Trenchless pipeline installation in one step
The Direct Pipe® technology combines the advantages of Microtunnelling and HDD and can be applied in all ground conditions. In one step only, a Microtunnelling TBM excavates the borehole and the prefabricated pipeline is installed using a Pipe Thruster in the launch pit. This allows safe and fast installation of pipeline crossings and landfalls. A new distance world record was set in 2020 in New Zealand, where a 48” pipeline has been installed on a length of 2,021 meters. Direct Pipe® is available in diameters ranging from 24” to 60”, using a newly developed slurry jet pump system for small diameters.
Specification Title | Specification Description |
---|---|
Certifications / licenses
|
Herrenknecht is inventor and patent holder.
|
Areas of Application
|
Crossing of rivers, roads, railroads, and other terrain or obstacles in all types of geologial formations, including shore approaches and marine/sea outfalls and landfalls; typical fields are pipelines for oil & gas, water, sewage, desalination...
|
Application conditions
|
Applicable in all ground conditions, even in highly permeable soils; due to simple launch and target pits also available in densely populated areas and/or in tight site conditions.
|
Pipe diameters
|
24” – 60”.
|
Coatings
|
PE, PP, FBE, GRP, Concrete.
|
Drilling lengths
|
Up to 2.000m (depending on project conditions like diameter, geology, etc.).
|
Installation speed
|
Up to 200m / 24 hours
|
Environment
|
Minimum risk of inadvertent fluid return (frac-out); small footprint; sequenced operation; reduced noise emissions.
|
Accuracy
|
Comparable to other trenchless installation methods (+/- 1,5m over 1000m distance); can be increased by intermediate control or reference survey(s).
|
Reviews
The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.
[9/9]
Relative Business Impact

Sign up or log in to your Explorer Plus or higher plan to get access to all the 12 deployment references.
Last Deployment Year